Public Jobs
Sort by
Bid Status
Bids Due in 7 days
4/10/25 2:30pm
22046 UM Soccer Complex Renovation
#17857
Bids Due in 7 days
McCarty Architects
Oxford, MS (The University of Mississippi)
(T-NR) The Work of Project is defined by the Contract Documents and consists of renovations of the existing Soccer Complex on the University, MS campus of the University of Mississippi. Renovation of the soccer field includes demolition and replacement of the drainage, irrigation, and playing surface of both the game and practice fields and team bench areas. Related construction includes field accessories (goals, corner markers, poles, netting, field marking systems, et al), concrete sidewalks/paving, fencing and gates, and landscape. The area of field renovation i s a pproximately 4 .1 a cres. T he s cope a lso includes removal of the existing stadium audio system, installation of a new audio system (including press box located audio power and control systems) installation of new field level convenience power, and extension of existing fiber communications to the new team bench areas on the east side of the field.
Bids Due in 21 days
4/24/25 2:00pm
23032 UM SOC Early Learning and Evaluation Center (ELEC)
#17910
Bids Due in 21 days
McCarty Architects
Oxford, MS (The University of Mississippi)
(T-NR) The project is two stories with a total of approximately 51,500 sf of new construction, of which +/-14,900 sf is shell space on the second floor.